400-600-5686

15111103966 (Manager Shao)

CHP30B Vehicle-mounted wet spraying machine

Page view
Product Overview
The manipulator is flexible in action, wide in construction scope and free of construction blind areas.
I want to inquire price
Product Overview

Product Description

1.Strong mobility, convenient transition, and covering multiple tunnel faces; 

2.Electric power system has strong adaptability and high reliability.

3.The manipulator is flexible in action, wide in construction scope and free of construction blind areas.

4.The dosage of accelerator is automatically matched with the concrete square quantity to reduce the consumption of accelerator.

5.The maximum spraying volume can reach 30m3/hour, and the comprehensive rebound rate can be controlled to be no more than 15%; 

6.Cost-effective, durable equipment, easy maintenance, accessories easy to purchase.

 

Technical parameters

Concrete outlet pressure

7.5Mpa

Inner diameter of conveying cylinder

Φ160mm

Conveying cylinder stroke

1000mm

Hydraulic system

Open

Conveying pipe diameter

Φ 125 - Φ 80 mm diameter change

Nozzle diameter 

Φ50mm

Chassis parameters

Chassis model

FOTON chassis

Wheelbase

5250mm

Front axle track

1940mm

Rear axle track

1861mm

Fuel tank volume

200L

Maximum speed

≤90km/h

Maximum gradability

≤20%

Minimum ground clearance

260mm

Minimum turning radius

18m

Admixture output flow

0~1000L/h

Maximum outlet pressure of admixture system

18bar

 

Product

Bottom valve DN25

Jackstay

Speed measurement sensor

Reducer 100-80

Duct 1.5M

Recommended Products

relevant information

Assembly Site of Steel Formwork Trolley in Wudongde hydropower station, Sinohydro Bureau 6 Co., Ltd.
Construction Site of Lining Trolley of West Ring Railway in Hainan, China Construction Sixth Engineering Division Corp., Ltd.
Construction Site of Steel Formwork Trolley for Kaili-Leishan Expressway in Guizhou, Sinohydro Bureau 14 Co., Ltd.
Railway Lining Trolley, Dong 'an Tunnel, Quzhou-Jiujiang Railway, CCCC Second Highway Engineering Co., Ltd.
Railway Lining Trolley, Dong 'an Tunnel, Quzhou-Jiujiang Railway, CCCC Second Highway Engineering Co., Ltd.
Bakang Tunnel Exit, Wangan Expressway, China Railway Port and Channel Engineering Group Co., Ltd.
Lining of Changheba Hydropower Station, Sinohydro Bureau 14 Co., Ltd.
Needle Beam Trolley, SINOHYDRO Vietnam Songbung 4 Hydropower Station

在线留言