+86 187 7400 0311 (Mr.Yang)

 

Email:  tunnel@hn-wuxin.com

Product

Concrete wet spraying machine WHP30Q

浏览量
Product Overview
It is equipped with dual fuel and electric power system, of which the electric drive is used for normal construction and diesel fuel is used for emergency work in case of power failure. It is designed with the optional air compressor with power of 75kW.
重量:
0.00
Inquiry
Product Overview

It is equipped with dual fuel and electric power system, of which the electric drive is used for normal construction and diesel fuel is used for emergency work in case of power failure.

 

It is designed with the optional air compressor with power of 75kW.

Technical parameters

Length

7800mm

Width

2460mm

Height

3300mm

Weight

16000kg (without accelerator)

Drive mode

Electric power system + Diesel emergency system

Engine model

4BTAA3.9-C125

Engine power

93kW

Rated power of motor

65kW

 Pump cylinder direction, cylinder diameter

Longitudinal at rear endφ180mm

Stroke of cylinder

1000mm

Jetting capacity

30m³/h

Diameter of conveying pipe

Φ125mm-φ80mm with reduced diameter

Maximum particle size of aggregate

16mm

Concrete outlet pressure

75bar

Accelerator pump model

SED12

Drive mode

Four wheel drive

Maximum pressure of accelerator

20bar

Theoretical maximum displacement of accelerator

14.4L/min

Capacity of accelerator tank

1000L

Chassis model

Engineering chassis developed by Wuxin

Wheelbase

4460mm

Maximum travelling speed

20km/h

Minimum turning radius

Inner 1.9m and outer 5.9m

Maximum gradeability

46%

Minimum ground clearance

465mm

Braking distance

5m (20km/h)

 

Underground Mining Drilling Rig

Bottom valve DN25

Jackstay

Speed measurement sensor

Reducer 100-80

Recommended Products

relevant information

Wuxin double-boom rock drilling rig is used in Niujinshan Tunnel of Northwest Second Ring Road of China Railway Sixth Bureau
Wuxin double-boom rock drilling rig is used in Changqing Tunnel of Shenbai High-speed Railway
Wuxin double-boom rock drilling rig is applied to Naqing Expressway on Guizhou Highway
Wuxin three-arm rock drilling rig is applied to the No. 2 Tunnel of Lalong Village of Tianba Expressway
Wuxin three-arm rock drilling rig is applied to Qingmiaozhai Tunnel of Guinan High-speed Railway
Wuxin three-arm rock drilling rig is applied to Chengkai Jiming Expressway
Wuxin three-arm rock drilling rig is used in Baoping Expressway Qinling Tiantaishan Extra-long Tunnel
Wuxin two-arm rock drilling rig is applied to Chongqing Yuwu Expressway