+86 187 7400 0311 (Mr.Yang)

 

Email:  tunnel@hn-wuxin.com

Product

Standardized railway lining trolley

浏览量
Product Overview
The portal frame system, traveling system, support system, electrical system and hydraulic system of a trolley can be increased from the original once to many times.
重量:
0.00
Inquiry
Product Overview

Product overview

Higher reuse rate:The portal frame system, traveling system, support system, electrical system and hydraulic system of a trolley can be increased from the original once to many times.

Faster assembly speed:A large number of pin shaft connections are adopted to replace bolt connections, thus improving the assembling efficiency by 30%.

Faster supply speed:It can realize production ahead of schedule and reduce the supply speed from the original 30 days to 7 days.

Higher installation accuracy and intensity:Standardized production, higher-precision pin shaft connection structure, and a large number of substituted steel structures with pipe structures in the framework support system ensure higher installation dimensional accuracy and more stable stress structure.

Underground Mining Drilling Rig

Bottom valve DN25

Jackstay

Speed measurement sensor

Reducer 100-80

Recommended Products

relevant information

Wuxin double-boom rock drilling rig is used in Niujinshan Tunnel of Northwest Second Ring Road of China Railway Sixth Bureau
Wuxin double-boom rock drilling rig is used in Changqing Tunnel of Shenbai High-speed Railway
Wuxin double-boom rock drilling rig is applied to Naqing Expressway on Guizhou Highway
Wuxin three-arm rock drilling rig is applied to the No. 2 Tunnel of Lalong Village of Tianba Expressway
Wuxin three-arm rock drilling rig is applied to Qingmiaozhai Tunnel of Guinan High-speed Railway
Wuxin three-arm rock drilling rig is applied to Chengkai Jiming Expressway
Wuxin three-arm rock drilling rig is used in Baoping Expressway Qinling Tiantaishan Extra-long Tunnel
Wuxin two-arm rock drilling rig is applied to Chongqing Yuwu Expressway