+86 187 7400 0311 (Mr.Yang)

 

Email:  tunnel@hn-wuxin.com

Multifunctional tunnel arch installation vehicle HLC212

浏览量
Product Overview
Installation and steel mesh laying of steel arches (including steel arches and grille arches) for full-section and step construction of tunnels; high-altitude work platforms for quality inspection, wind pipe installation, defect repair, grouting, etc.
重量:
0.00
Inquiry
Product Overview

Safety: As equipped with three mechanical arms and three working platforms, the workers can be kept far away from the construction area of the tunnel.

Five reasons for you selection of Wuxin multifunctional tunnel arch installation vehicle

Safety: equipped with two mechanical arms and two working platforms, workers are far away from the face, and the working environment is safer;

Labor-saving: Only 4 people are needed for one equipment to complete the steel frame installation and reinforcement mesh laying, which can save 2-3 people;

Money-saving: The vehicle is equipped with the flexible chassis, which can cover multiple construction areas to reduce equipment investment;

High-efficiency: The construction with this machine can improve the efficiency. It only takes 20-30 minutes to install one arch frame, so as to speed up the process cycle;  

Local/remote control: The local or remote control can be flexibly selected according to the difference of working conditions, which can bring about high adaptability

Technical parameters

Chassis power

162kw

Maximum traveling speed

85km/h

Minimum turning radius

9.75m

Maximum gradeability

30°

Overall length

9420mm

Overall width

2500mm

Overall height

3500mm

Overall weight

21000kg

Lifting capacity

1000kg

Maximum working horizontal width

±9m

Boom support pitch

-20°-58°

Working platform rotation angle

120°

Minimum ground clearance

300mm

Wheelbase

5250mm

Front axle track

1987mm

Rear axle track

1860mm

Tire model

9.00R20

Tire diameter

900mm

Drive mode

Rear wheel drive

Steering

Front wheel steering

Maximum lifting height

12m

Maximum working horizontal distance

11m

 Swing angle of boom support

±40°

Pitch of manipulator

-20°-90°

 

Product

Underground Mining Drilling Rig

Bottom valve DN25

Jackstay

Speed measurement sensor

Reducer 100-80

Recommended Products

relevant information

Wuxin double-boom rock drilling rig is used in Niujinshan Tunnel of Northwest Second Ring Road of China Railway Sixth Bureau
Wuxin double-boom rock drilling rig is used in Changqing Tunnel of Shenbai High-speed Railway
Wuxin double-boom rock drilling rig is applied to Naqing Expressway on Guizhou Highway
Wuxin three-arm rock drilling rig is applied to the No. 2 Tunnel of Lalong Village of Tianba Expressway
Wuxin three-arm rock drilling rig is applied to Qingmiaozhai Tunnel of Guinan High-speed Railway
Wuxin three-arm rock drilling rig is applied to Chengkai Jiming Expressway
Wuxin three-arm rock drilling rig is used in Baoping Expressway Qinling Tiantaishan Extra-long Tunnel
Wuxin two-arm rock drilling rig is applied to Chongqing Yuwu Expressway

在线留言