400-600-5686

15111103966 (Manager Shao)

Arch installation vehicle

浏览量
Product Overview
Installation and steel mesh laying of steel arches (including steel arches and grille arches) for full-section and step construction of tunnels; high-altitude work platforms for quality inspection, wind pipe installation, defect repair, grouting, etc.
我要询价
Product Overview

Main functions:

Installation and steel mesh laying of steel arches (including steel arches and grille arches) for full-section and step construction of tunnels; high-altitude work platforms for quality inspection, wind pipe installation, defect repair, grouting, etc.

 

Main technical features:

Safe: Equipped with two mechanical arms and two working platforms to keep workers away from the face and provde a safer operating environment;

Labor-saving: only 4 people are required to install steel frame and lay steel mesh for one device, saving investment of 2-3 people.

Money-asving: automobile chassis is flexible so that one device can take into account more than one face, reducing equipment investment;

Efficient: Mechanized construction improves work efficiency, takes only 30-40 minutes to install an arch frame, and accelerates process cycle;

 

technical parameters

Item Parameter
Chassis power 118kw
Maximum  driving speed 80km/h
Minimum  turning radius 10m
Maximum gradability 15°
Whole vehicle length 9000mm
Whole vehicle width 2480mm
Whole vehicle height 3100mm
Whole vehicle mass 15400kg
Lifting capacity 1500kg
Maximum  horizontal width of operation ±9m
Boom  pitch angle -20° to +58°
Working platform  rotation angle 120°
Minimum ground clearance 300mm
Wheelbase 5250mm
Front axle track 1987mm
Rear axle track 1860mm
Tire model 9.00R20
Tire diameter 900mm
Drive mode Rear wheel drive
Steering Front wheel steering
Maximum  lifting height 12m
Maximum  horizontal distance of operation 11m
Boom  swinging angle ±40°
Manipulator pitch angle ﹣20° to ﹢90

 

Product

Bottom valve DN25

Jackstay

Speed measurement sensor

Reducer 100-80

Duct 1.5M

Recommended Products

relevant information

Assembly Site of Steel Formwork Trolley in Wudongde hydropower station, Sinohydro Bureau 6 Co., Ltd.
Construction Site of Lining Trolley of West Ring Railway in Hainan, China Construction Sixth Engineering Division Corp., Ltd.
Construction Site of Steel Formwork Trolley for Kaili-Leishan Expressway in Guizhou, Sinohydro Bureau 14 Co., Ltd.
Railway Lining Trolley, Dong 'an Tunnel, Quzhou-Jiujiang Railway, CCCC Second Highway Engineering Co., Ltd.
Railway Lining Trolley, Dong 'an Tunnel, Quzhou-Jiujiang Railway, CCCC Second Highway Engineering Co., Ltd.
Bakang Tunnel Exit, Wangan Expressway, China Railway Port and Channel Engineering Group Co., Ltd.
Lining of Changheba Hydropower Station, Sinohydro Bureau 14 Co., Ltd.
Needle Beam Trolley, SINOHYDRO Vietnam Songbung 4 Hydropower Station

在线留言